New Standards for Energy Storage in Türkiye
As we enter 2025, the Turkish energy market is witnessing significant regulatory shifts. EPDK and TEİAŞ have updated the Grid Code to include specific performance requirements for Battery Energy Storage Systems (BESS).
Key Takeaways for Investors:
- Frequency Control Obligations: BESS units must now demonstrate sub-second response times to participate in grid balancing.
- Data Transparency: Real-time telemetry data is now mandatory for systems integrated into the national grid.
- Safety Certifications: Stricter fire safety and IEC standards are being enforced for industrial storage installations.
At Alavan Energy, all our systems, managed by the ALAONE AI ecosystem, are fully compliant with these new mandates, ensuring that our partners remain ahead of regulatory risks while maximizing their grid-participation revenue.